Payment Type: | L/C,T/T |
---|---|
Incoterm: | FOB,CFR,CIF |
Min. Order: | 1 Set/Sets |
Delivery Time: | 35 Days |
Model No.: customized
1. Technology:We have centers and innovative designing teams for different kinds of production lines.
2. After Sale Service:Warranty period 1 year , after this period , we are willing to give help if customer needs accessory . The real cooperation will not end at the delivery . we believe that satisfied after sale service means a lot.
3. Inspected by the Sellers:After completing the manufacturing and assembling of the equipments, we will test the machines and commissioning in the workshop.
4. Inspected by the Buyers:After confirmation of a sound work of the line, we will invite our customer to send their representatives to inspect the production lines in our factories.
The technical parameters
Name | |
Configurations | Manual Uncoiler, Guiding Platform, 9 Shaft Strip Leveler, Main Machine Of Roll Forming, Hydraulic Motor, Pre-Punching Device,Pre-Cutting Device, Hydraulic Station, PLC Control, Supporter Table. |
Control stystem | PLC Inverter Encoder Touch Screen |
Main frame | Iron plate welding |
Total power | 7.5 kw |
power supply | 380V, 3-Phase,50Hz |
forming speed | 10-15m/min |
Roll station | 15 stands |
Roller diameter | 60mm |
Feeding thickness | 0.3-1.2mm |
Total weight | About 3 T |
Custom | According to customer's requirements |
Packaging Details: main machine is naked and the computer control box is packed by carton box
Delivery Detail: 30days after receiving the deposit
1.We have professional technicians for loading
Guaranteed the goods load into container without any damage.
2. Transportation : Machines need one 40 feet container to hold
3.Please provide us the nearest port name, we will ask shipping cost and arrange shipping for you.
.After-sales service
A: Warranty: One year ,and we will provide the technical support for the whole life.
B: Training: the buyer should charge of visa, round-trip ticket, food and accommodation
overseas and USD100/person/day for salary.
C: Need one technician.
D: Training time: one week (contains the time of installation and adjustment)
Product Categories : Light Steel Keel Roll Forming Machine